April 26, 2022
Erin Rushing of Trailblazers in Bentonville, AR (#67)
Trail EAffect Episode 67 Erin Rushing of Trailblazers
- Erin Rushing Back Story
- The early years of trails and greenways in NW Arkansas
- Razorback Greenway
- The Transformation of Trailblazers
- Unique common areas in Bella Vista that allowed for trail building and access
- Greenway Extensions into Bella Vista
- How Trailblazers develops trails
- Building the Back 40 Trail System in Bella Vista, AR
- Diversity of Trail Experiences within the Back 40 with different builders
- 40 miles of trail built in 9 months
- The Ledges
- Lessons learned through building out trails in NW Arkansas
- More Green level trails needed
- Tuning up the existing system and making trails better in 2022
- Bicycle Playgrounds for kids in parks
- Famous Failure and what was learned
- Experimenting with trail surfaces
- Quick to react
- Building smaller systems – Larger / 10 to 12 miles to make a worthwhile trail system
- More Neighborhood connections in 2022
- What makes a great trail community according to Erin
- E Bikes in NW Arkansas
- Little Sugar as an E bike trail system
- Commuting to work via trails by E bike
- Closing Comments
Links:
Trailblazers: https://www.nwatrailblazers.com/
We Are ETHIC: https://weareethic.org/
OZ Trails: https://www.oztrails.com/
Professional Trail Builders Association: https://www.trailbuilders.org/
This Podcast has been edited and produced by Evolution Trail Services
Trail EAffect Show Support:
Smith’s Bike Shop: https://smithsbikes.com/
Evolution Trail Services: www.evotrails.com
Contact Josh at evolutiontrails@gmail.com
Support Trail EAffect through donations at: https://www.patreon.com/traileaffect
You can also reach out and donate via PayPal or other means if you feel so inclined to do so.
Apple Podcasts
Spotify
Castro
iHeartRadio
PlayerFM
Castbox
Amazon Music
TuneIn
Goodpods
Deezer
Audible
Podchaser
Podyssey
RSS Feed